Take a look at a selection of our recent and past projects
Beginning of the Bale Deck Swap. This is the Deck that was on the old truck that needed to come off.
The Deck is carefully being removed and prepped for the transfer
The truck receiving the deck needed to be prepped and new supports welded in place
The bale deck swap successfully functioning and back to work
Bale shredder maintenance before
Bale shredder after. Maintenance performed and replaced a few parts that were needing to be replaced to ensure proper working condition of equipment.
Successfully replaced the PTO gear box on this concrete truck
Maintenance work done on this CAT 262D skid steer. Keeping up on a proper schedule is important for reliable equipment
Engine parts rebuild and maintenance done on this piece of equipment. Being able to extend the life of equipment is helpful to avoid the hefty cost of replacing it
Valve Body reseal
Happy customer after having their equipment taken care of and shown some care
Out with the old in with the new! Full engine replacement for this f350 bale truck